Location Amadi Univerisity
Data of installation 6-8 march 2017
Average wind/sun production 118 kw
Hybrid system connection External illumination
Where the energy is used: external illumination of the main building University and the alleyways as well as the reception.
Remote control of the systems from the technical office in Italy
The system provides an automatic switching to the grid when there maintenance is being done or when it’s necessary to update the system.